• Skip to main content
  • Skip to primary sidebar

Metropolitan Research Institute

Metropolitan Research Institute, Budapest

  • Introduction
    • About us
    • Staff
    • Contact
  • News
  • Projects
  • Publicity
    • Publications
    • Lectures and interviews
    • Studies
  • Hungarian
  • HomeLab
  • OpenHeritage
  • UPLIFT
  • MRI2019
  • Visegrad Grant
  • SHARED Green Deal
  • SOLACE-CEE
  • AHA Budapest

Feasibility study of Székesfehérvár intermodal centre

2013-05-01

Title: Detailed feasibility study of the project “Creation of Székesfehérvár regional intermodal public transport centre”, including cost-benefit analysis (CBA) and connected documentation

Client: Municipality of the City of Székesfehérvár

Period: 04/2012 – 05/2013

Partners: PwC Kft. (consortium leader), Közlekedés Kft., Pro Urbe Kft. (consortium partners)

Description:

The Municipality of the City of Székesfehérvár, co-financed by the Transport Operational Programme (KÖZOP) ordered a detailed feasibility study on the intermodal centre to be located near the railway station, in order to facilitate further project preparations and planning application.

MRI elaborated the project background; among others we presented the importance of intermodality and intermodal centres both from transport and urban development point of view, reviewed the EU and national law relevant for the project, and studied the project’s conformity with relevant EU, national and local policy documents, strategies, plans and connecting projects. Based on data collection, data provided by the client, interviews with professionals and site visits to all parts of the city we produced the prognoses underlying the traffic model.

We produced the preliminary options analysis, from the elaboration of the methodology of the multi-criteria analysis. We identified four main factors as a basis for creating options, and assessed their altogether 24 solution alternatives in a quantitative way from cost, benefit and feasibility points of view. In questions needing political decision we prepared and asked decisions from the Assembly of the City of Székesfehérvár. We combined the reasonable solution alternatives to form a limited number of main technical alternatives proposed for detailed options analysis. We also studied the functional layout of the railway station building using international good practice.

Filed Under: Egyéb Tagged With: Project preparation – feasibility studies

Primary Sidebar

News

  • József Hegedüs’s mentee obtained her PhD
  • New Brochure on Energy Efficiency Renovations in CEE+SEE is now online
  • ReHousIn Policy Lab in Budapest
  • ESPON URDICO Kickoff meeting in Budapest
  • Workshop on the dilemmas of the Social Climate Plan
  • MRI as partner in the MICAD project
  • We have reached the first milestone in the SOLACE CEE project!
  • Urban Forum: Productive, Green and Just urban development
  • Comparative analysis of the subsidy schemes supporting the energy efficient renovation of residential buildings
  • SOLACE-CEE Project launched

Metropolitan Research Institute · Városkutatás Kft. © Copyright 1989-2019 · All Rights Reserved

Honlapkészítés: Prémium Honlap